FIN: (76HF) CABLE ASSY
AMM TASK
- LEAK DETECTION
-
36-22-00-040-001-A
Deactivation of the Pylon Overheat Sensing-Element -
36-22-00-440-001-A
Reactivation of the Pylon Overheat Sensing-Element -
36-22-00-710-001-A
Operational Test of the Overheat Detection System -
36-22-00-760-803-A
Measurement of the Centre Wire Resistance (CWR) of the OverHeat Detection System (OHDS) Loops -
36-22-00-710-802-A
Operational Test of the Overheat Detection System -
36-22-00-760-802-A
Measurement of the Centre Wire Resistance (CWR) of the OverHeat Detection System (OHDS) Loops -
36-22-00-790-001-A
Leak Check on all the Bleed Air Ducts and the Packs Components -
36-22-00-200-804-A
Wetting Current Procedure -
36-22-00-200-802-A
Wetting Current Procedure -
36-22-00-790-802-A
Leak Check on all the Bleed Air Ducts and the Packs Components -
36-22-00-100-801-A
Clean the Overheat Detection System (OHDS) Connectors and Apply the Electrical Insulating Compound -
36-22-00-100-803-A
Clean the Overheat Detection System (OHDS) Connectors and Apply the Electrical Insulating Compound -
36-22-00-710-803-A
Operational Test of the Overheat Detection System -
36-22-00-760-801-A
Measurement of the Centre Wire Resistance (CWR) of the OverHeat Detection System (OHDS) Loops -
36-22-00-200-803-A
Wetting Current Procedure -
36-22-00-790-803-A
Leak Check on all the Bleed Air Ducts and the Pack Components -
36-22-00-100-802-A
Clean the Overheat Detection System (OHDS) Connectors and Apply the Electrical Insulating Compound
-
36-22-00-040-001-A