FIN: (22FN) IND-ISIS
AMM TASK
- INDICATOR - ISIS (INTEGRATED STANDBY INSTRUMENT SYSTEM)
-
34-22-25-170-001-A
Draining and Flushing of Standby Pneumatic Circuits -
34-22-25-000-001-A
Removal of the Integrated Standby Instrument System (ISIS) Indicator -
34-22-25-400-001-A
Installation of the Integrated Standby Instrument System (ISIS) Indicator -
34-22-25-710-001-A
Operational Check of ISIS DC HOT Bus SUPPLY -
34-22-25-740-001-A
BITE Test of the Integrated Standby Instrument System (ISIS) Indicator with the Pushbutton Switches on the Face of the Indicator -
34-22-25-790-001-A
Low range Leak Test of the Standby Pneumatic circuits -
34-22-25-720-001-A
Functional Test of the Integrated Standby Instrument System (ISIS) Indicator -
34-22-25-200-001-A
ISIS Inspection for Legibility -
34-22-25-100-001-A
Cleaning of the ISIS Indicator
-
34-22-25-170-001-A