W DOC AIRBUS | AMM A320F

Installation of the EFB Laptop


TASK 46-26-34-400-802-A
Installation of the EFB Laptop


ZONE: 212
1. Reason for the Job
This procedure can be done by licensed engineer/certified mechanics or by flight crew personnel in accordance with the airline policy.
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
212
COCKPIT
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
3. Job Set-up
Subtask 46-26-34-861-053-A ** ON A/C NOT FOR ALL
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 46-26-34-865-054-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 39TA1 (DOCKING STATIONEFB LAPTOP)
122VUEFB/CAPT41TA1U08
FOR FIN: 39TA2 (DOCKING STATIONEFB LAPTOP)
49VUEFB/F/O41TA2H09
4. Procedure
Subtask 46-26-34-420-051-A ** ON A/C NOT FOR ALL
A. Installation of the Laptop
   (1) Start the laptop (Refer to the laptop user-guide) and close it.
   (2) Put the laptop in the CAPT(F/O) EFB Laptop Docking Station (LDS).
   (3) Connect the laptop to the cables that follow:
  • Video cable (optional)
  • USB cable
  • Ethernet cable
  • Power supply cable.
   (4) Close the top of the CAPT(F/O) EFB LDS.
Subtask 46-26-34-865-055-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
FOR FIN: 39TA1 (DOCKING STATIONEFB LAPTOP)
122VUEFB/CAPT41TA1U08
FOR FIN: 39TA2 (DOCKING STATIONEFB LAPTOP)
49VUEFB/F/O41TA2H09
Subtask 46-26-34-710-050-A ** ON A/C NOT FOR ALL
C. Test
   (1) On the CAPT(F/O) EFB LDS control panel, push the DOCK STATION pushbutton switch.
   (2) On the CAPT(F/O) EFB DU, get access to the EFB Monitoring Page (Refer to the EFB Monitoring Page User's Guide).
NOTE: The airline has also the possibility to customize and define its own way to start the EFB Monitoring Page. It can for example be integrated in the FlySmart with Airbus application suite or any other 3rd party application Framework.
   (3) Make sure that all the items are OK.
   (4) Make sure that the touchscreen is OK.
5. Close-up
Subtask 46-26-34-860-051-A ** ON A/C NOT FOR ALL
A. Stop the Laptop
   (1) From the CAPT(F/O) EFB DU touchscreen, stop the laptop.
   (2) On the CAPT(F/O) LDS control panel, push the DOCK STATION pushbutton switch. The OFF legend of the DOCK STATION pushbutton switch goes off.
Subtask 46-26-34-862-050-A ** ON A/C NOT FOR ALL
B. De-energize the ground service network
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:26:10 UTC