Removal of the Laptop Docking Station (LDS)
TASK 46-26-34-000-001-A
Removal of the Laptop Docking Station (LDS)
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 46-26-34-861-050-A ** ON A/C NOT FOR ALL Subtask 46-26-34-865-050-A ** ON A/C NOT FOR ALL
Subtask 46-26-34-020-050-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:26:09 UTC
Removal of the Laptop Docking Station (LDS)
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 122 | AVIONICS COMPARTMENT |
| 212 | COCKPIT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
Subtask 46-26-34-861-050-A ** ON A/C NOT FOR ALL Subtask 46-26-34-865-050-A ** ON A/C NOT FOR ALL
B. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| FOR FIN: 39TA1 (DOCKING STATIONEFB LAPTOP) | |||
| 122VU | EFB/CAPT | 41TA1 | U08 |
| FOR FIN: 39TA2 (DOCKING STATIONEFB LAPTOP) | |||
| 49VU | EFB/F/O | 41TA2 | H09 |
Subtask 46-26-34-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the EFB LDS
(a) Get access to the Avionics Compartment.
(b) Disconnect the connectors P3 (5) and P1 (6).
(c) Get access to the cockpit.
(d) Remove the six screws (3) and the plate (4).
(e) Disconnect the connector P2 (2).
(f) Remove the eight screws (9) and washers (10) from the EFB LDS (11).
(g) Pull the harnesses (2), (5) and (6) outside the lateral console.
(h) Remove the F/O EFB LDS.
(2) FOR [39TA1] (DOCKING STATION-EFB LAPTOP)
(a) Get access to the Avionics Compartment.
(b) Disconnect the connectors P3 (7) and P1 (8).
(c) Get access to the cockpit.
(d) Remove the six screws (3) and the plate (4).
(e) Disconnect the connector P2 (1).
(f) Remove the eight screws (9) and washers (10) from the EFB LDS (11).
(g) Pull the harnesses (1), (7) and (8) outside the lateral console.
(h) Remove the CAPT EFB LDS.
NOTE: The laptop must be removed from the EFB LDS before the removal of the EFB LDS.
(1) FOR [39TA2] (DOCKING STATION-EFB LAPTOP)(a) Get access to the Avionics Compartment.
(b) Disconnect the connectors P3 (5) and P1 (6).
(c) Get access to the cockpit.
(d) Remove the six screws (3) and the plate (4).
(e) Disconnect the connector P2 (2).
(f) Remove the eight screws (9) and washers (10) from the EFB LDS (11).
(g) Pull the harnesses (2), (5) and (6) outside the lateral console.
(h) Remove the F/O EFB LDS.
(2) FOR [39TA1] (DOCKING STATION-EFB LAPTOP)
(a) Get access to the Avionics Compartment.
(b) Disconnect the connectors P3 (7) and P1 (8).
(c) Get access to the cockpit.
(d) Remove the six screws (3) and the plate (4).
(e) Disconnect the connector P2 (1).
(f) Remove the eight screws (9) and washers (10) from the EFB LDS (11).
(g) Pull the harnesses (1), (7) and (8) outside the lateral console.
(h) Remove the CAPT EFB LDS.
Illustration of the Laptop Docking Station (LDS)