W DOC AIRBUS | AMM A320F

Check of the Flight Operations and MAintenance eXchanger (FOMAX) Configuration with the Portable Data Loader (PDL)


TASK 46-26-32-280-801-B
Check of the Flight Operations and MAintenance eXchanger (FOMAX) Configuration with the Portable Data Loader (PDL)


ZONE: 128
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
ALT45200001
1
PORTABLE DATA LOADER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
128
REAR AVIONIC COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
3. Job Set-up
Subtask 46-26-32-861-074-A ** ON A/C NOT FOR ALL
A. Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 46-26-32-480-052-A ** ON A/C NOT FOR ALL
B. Installation of the ALT45200001 PORTABLE DATA LOADER in the cockpit on center pedestal
   (1) On the ALT45200001 PORTABLE DATA LOADER, make sure that the ON/OFF switch is in the OFF position.
   (2) On the center pedestal, on DATA LOADING panel 117VU:
  • Connect the cable to the ALT45200001 PORTABLE DATA LOADER and to the DATA LOADER connector on the front face of the DLSU (103TD).
Subtask 46-26-32-865-077-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
121VUDATA/LOADER/SPLY3TDJ16
121VUDLSU &/DLRB/SPLY5TDJ15
121VUFOMAX67TAJ01
121VUPDL/PWR/SPLY14TDK19
** ON A/C NOT FOR ALL
121VUPDL/PWR/SPLY14TDJ45
121VUDATA/LOADER/SPLY3TDJ39
121VUDLSU &/DLRB/SPLY5TDJ38
121VUFOMAX67TAR12
Subtask 46-26-32-860-100-A ** ON A/C NOT FOR ALL
D. Start of the PDL
   (1) Start the ALT45200001 PORTABLE DATA LOADER (refer to the PDL user guide).
4. Procedure
Subtask 46-26-32-280-061-A ** ON A/C NOT FOR ALL
A. Check of the FOMAX Configuration with the PDL
ACTION
RESULT
1.On the center pedestal, on the Data Loading Selector Unit (DLSU):
  • Set the ON/OFF switch to ON.
On the display of the DLSU, the indication that follows comes into view:
  • DB/N:XXXXXXXXXX DLSU.
    Default value: '----------'.
2.On the center pedestal, on the DLSU:
  • Push the NEXT key.
The DLSU does selfs-tests.
3.Make sure that no error message comes into view.
On the display of the DSLU, the indication that follows comes into view:
  • STANDBY
    PUSH PREV/NEXT
4.On the center pedestal, on the DLSU:
  • Push the PREV or NEXT key until you get the FOMAX indication and push the SEL key.

On the PDL:
5.Do the initialization procedure.
On the PDL:
  • The FINs and the P/Ns of the FOMAX hardware and FOMAX software come into view.
Subtask 46-26-32-860-101-A ** ON A/C NOT FOR ALL
B. Stop of the PDL
   (1) Stop the ALT45200001 PORTABLE DATA LOADER (refer to the PDL user guide).
Subtask 46-26-32-080-052-A ** ON A/C NOT FOR ALL
C. Removal of the PDL
On the center pedestal, on Data Loading panel 117VU:
  • Disconnect the PDL cable from the PDL and from the front face of the DLSU (103TD)
5. Close-up
Subtask 46-26-32-410-067-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
Subtask 46-26-32-862-074-A ** ON A/C NOT FOR ALL
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).