1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 1M(3 FT)
No specific
1
GAGE 5 BAR (75 PSI) - PRESSURE
No specific
1
GROUND AIR-SUPPLY UNIT(HIGH PRESSURE)
 B. Consumable Materials
REFERENCE
DESIGNATION
No specific
water
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
171AL
131NW, 131PW
161DW
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 12-15-38-613-001-A
Fill the Potable Water Tank System (Aircraft Electrical Power Available)
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 38-10-00-614-002-A
Depressurization of the Potable Water System
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
TASK 52-30-00-860-002-A
Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
F Manometer Attach Point ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 38-41-00-861-050-A
A. Energize the aircraft electrical circuit (Ref. AMM TASK 24-41-00-861-002).
Subtask 38-41-00-010-051-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Put the ACCESS PLATFORM 1M(3 FT) in position at Zone 171.
   (2) Open the service door 171AL.
   (3) Open the AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
   (4) Open the partition panel 161DW.
Subtask 38-41-00-010-051-B ** ON A/C NOT FOR ALL
B. Get Access
   (1) Put the ACCESS PLATFORM 1M(3 FT) in position at Zone 138.
   (2) Open the service door 171AL.
   (3) Open the FWD cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
   (4) Open the partitions 131PW 131NW.
Subtask 38-41-00-614-053-A ** ON A/C NOT FOR ALL
C. Release of the Pressure from the Potable Water System
   (1) Turn and pull the fill and drain handle at the service panel 2023VU from the NORMAL to the FILL position.
   (2) Operate the water faucet in the lavatories to let air into the system.
   (3) Turn the fill and drain handle back to the NORMAL position.
Subtask 38-41-00-614-053-B ** ON A/C NOT FOR ALL
C. Release the pressure from the potable water system.
   (1) Press the membrane switch 'WATER SYS DEPRESS' on the FAP 124RH until the light comes on.
NOTE: The light in the membrane switch comes on when the depressurization valve 4MD opens.
   (2) Operate the water faucet in the lavatories to let air into the system.
   (3) Press the membrane switch 'WATER SYS DEPRESS' on the FAP 124RH again to close the depressurization valve 4MD after the system is depressurized.
NOTE: The light in the membrane switch goes out when the depressurization valve 4MD is closed.
NOTE: In cold weather conditions the depressurization valve 4MD must stay open. Do not press the membrane switch 'WATER SYS DEPRESS' on the FAP 124RH again after the system is depressurized.
NOTE: Before flight, make sure that the light in the membrane switch 'WATER SYS DEPRESS' on the FAP 124RH is not ON.
Subtask 38-41-00-614-053-C ** ON A/C NOT FOR ALL
C. Release the Pressure from the Potable Water System
   (1) Push the 'WATER DEPRESS' button on the FAP 120RH:
  • The green light in the button comes on.
  • The message 'VACUUM SYSTEM DISABLED - WATER DEPRESS ACTIVE' comes on.
  • On the aircraft symbol 'NO WATER PRESSURE' comes in view.
NOTE: The green light in the 'WATER DEPRESS' button comes on when the depressurization valve 4MD opens.
   (2) Operate the water faucet in the lavatories to let air into the system.
   (3) Return the Potable water System back to the normal condition:
     (a) Push the 'WATER DEPRESS' button on the FAP 120RH again.
     (b) The green light in the 'WATER DEPRESS' button is off.
   (4) No more messages are shown on the FAP.
Subtask 38-41-00-480-050-A ** ON A/C NOT FOR ALL
D. Installation of the Test Equipment
   (1) Remove the blanking plug from the test port downstream of the pressure reducing and relief valve.
   (2) Connect a GAGE 5 BAR (75 PSI) - PRESSURE to the test port.
   (3) Connect the GROUND AIR-SUPPLY UNIT(HIGH PRESSURE) to the ground air-pressure connection at the potable water service panel.
Subtask 38-41-00-480-050-B ** ON A/C NOT FOR ALL
D. Installation of the Test Equipment
   (1) Remove the exhaust nut at the depressurization valve 4MD.
F Manometer Attach Point ** ON A/C NOT FOR ALL
   (2) Connect a GAGE 5 BAR (75 PSI) - PRESSURE to the test port.
   (3) Connect the GROUND AIR-SUPPLY UNIT(HIGH PRESSURE) to the ground air-pressure connection at the potable water service panel.
Subtask 38-41-00-613-050-A
E. Fill the potable water tank with water (Ref. AMM TASK 12-15-38-613-001).
4. Procedure
Subtask 38-41-00-710-050-B
A. Do this test.
ACTION
RESULT
1.At the service panel 2023VU:
  • open the high-pressure air charging-valve and pressurize the potable water tank to 15 psi (1.0342 bar).
In the potable water air system:
  • the potable-water tank 3000MM starts to pressurize.
  • the manometer shows 15 psi (1.0342 bar).
2.At the service panel 2023VU:
  • slowly increase the pressure at the ground air-supply cart to between 39 psi (2.6890 bar) and 41 psi (2.8269 bar).
In the potable water air system:
  • the potable water system is pressurized.
  • the pressure reducing valve operates and stops the air supply to the tank (when the airflow to the tank decreases to zero).
  • the manometer shows between 25 psi (1.7237 bar) and 33 psi (2.2753 bar).
3.At the service panel 2023VU:
  • slowly increase the pressure at the ground air-supply cart to 55 -3 psi or +0 psi (3.7921 -0.2068 bar or +0.0000 bar).
In the potable water air system:
  • the pressure at the manometer does not increase.
  • there are no air leaks at the pressure reducing valve.
4.At the service panel 2023VU:
  • decrease the pressure of the ground air-supply cart back to 41 psi (2.8269 bar).
In the potable water air system:
  • the pressure at the manometer stays the same.
5.In one of the lavatories:
  • operate the water faucet.
In the lavatory:
  • water flows from the water faucet into the washbasin.
NOTE: When the pressure in the potable water system decreases, the pressure reducing valve starts the air supply to the system again.
6.At the service panel 2023VU:
  • close the high-pressure air charging-valve of the ground air connection.

5. Close-up
Subtask 38-41-00-614-050-A
A. Depressurize the potable water system (Ref. AMM TASK 38-10-00-614-002).
Subtask 38-41-00-080-050-A ** ON A/C NOT FOR ALL
B. Removal of the Test Equipment
   (1) Disconnect the ground air-supply cart.
   (2) Disconnect the manometer from the test port.
   (3) Install the blanking plug to the test port.
Subtask 38-41-00-080-050-B ** ON A/C NOT FOR ALL
B. Removal of the Test Equipment
   (1) Disconnect the ground air-supply cart.
   (2) Disconnect the manometer from the test port at the relief valve 4MD.
   (3) Install the exhaust nut to the test port.
Subtask 38-41-00-410-051-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the partition panel 161DW.
   (3) Close the AFT cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
   (4) Close the service door 171AL.
   (5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 38-41-00-410-051-B ** ON A/C NOT FOR ALL
C. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access panels 131PW 131NW 171AL.
   (3) Close the FWD cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
   (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Subtask 38-41-00-862-050-A
D. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:25:59 UTC