General Visual Inspection of the Decompression, Lining and Floor Panels
TASK 25-50-00-200-003-A
General Visual Inspection of the Decompression, Lining and Floor Panels
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 25-50-00-010-054-A ** ON A/C NOT FOR ALL
Subtask 25-50-00-210-059-A ** ON A/C NOT FOR ALL
Subtask 25-50-00-860-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.02 06:14:19 UTC
General Visual Inspection of the Decompression, Lining and Floor Panels
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| No specific | 1 | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 130 | FWD CARGO COMPT AFT BULKHEAD OF AVNCS COMPT TO FWD PRESSURE BULKHEAD OF WING CENTER BOX |
| 150 | AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 25-50-00-200-024-A | Cargo Compartment Linings with Honeycomb Core - General Repair/Protection Information |
| TASK 25-54-11-400-001-A | Installation of the Forward Cargo-Compartment Partition FR24A |
| TASK 25-54-12-300-001-A | Fasteners Missing from the Lining Panels of the Forward Cargo Compartment |
| TASK 25-54-12-400-001-A | Installation of the Forward Cargo-Compartment Partition |
| TASK 25-54-12-400-002-A | Installation of the Ceiling Panels in the Forward Cargo Compartment |
| TASK 25-54-12-400-003-A | Installation of the Sidewall Panels in the Forward Cargo Compartment |
| TASK 25-55-11-300-001-A | Fasteners Missing from the Lining Panels of the Aft Cargo Compartment |
| TASK 25-55-11-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR47 |
| TASK 25-55-11-400-002-A | Installation of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59 |
| TASK 25-55-11-400-003-A | Installation of the Sidewall Panels in the Aft Cargo Compartment - FR47/FR59 |
| TASK 25-55-12-300-001-A | Fasteners Missing from the Lining Panels of the Bulk Cargo Compartment |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-400-002-A | Installation of the Ceiling Panels in the Aft Cargo Compartment at FR59/FR65 |
| TASK 25-55-12-400-003-A | Installation of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65 |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 25-50-00-200-024-A | Cargo Compartment Linings with Honeycomb Core - General Repair/Protection Information (for corrective action) |
| TASK 25-50-00-340-002-A | Repair of the Flanges of the Cargo-Compartment Decompression Panels (for corrective action) |
| TASK 51-76-11-300-001-A | Repair of the Sealing (for corrective action) |
| TASK 53-22-14-000-001-A | Removal of the Forward Cargo-Compartment Floor-Panels (for corrective action) |
| TASK 53-22-14-400-001-A | Installation of the Forward Cargo-Compartment Floor-Panels (for corrective action) |
| TASK 53-22-14-400-001-A-01 | Installation of the Forward Cargo-Compartment Floor-Panels (Alternative Installation Procedure with the Skyflex Option) (for corrective action) |
| TASK 53-42-14-000-001-A | Removal of the Aft Cargo-Compartment Floor-Panels Zone 150 (for corrective action) |
| TASK 53-42-14-400-001-A | Installation of the Aft Cargo-Compartment Floor-Panels Zone 150 (for corrective action) |
| TASK 53-42-14-400-001-A-01 | Installation of the Aft Cargo-Compartment Floor-Panels (Alternative Installation Procedure with the Skyflex Option) (for corrective action) |
| SRM 530200 | (for corrective action) |
Subtask 25-50-00-010-054-A ** ON A/C NOT FOR ALL
A. Get Access
(1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(2) Open the forward and/or aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the forward and/or aft cargo-compartment door(s).
(4) Set the light switch to on.
(5) Put the WARNING NOTICE(S) on the control panel(s) of the cargo loading system to tell persons not to use it.
Subtask 25-50-00-865-129-A ** ON A/C NOT FOR ALL (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
(2) Open the forward and/or aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001).
(3) Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the forward and/or aft cargo-compartment door(s).
(4) Set the light switch to on.
(5) Put the WARNING NOTICE(S) on the control panel(s) of the cargo loading system to tell persons not to use it.
B. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | SEMI AUTO CLS-FWD | 3MY | E08 |
| 2000VU | SEMI AUTO CLS-FWD | 2MY | E06 |
| 2001VU | SEMI AUTO CLS-AFT | 103MY | D08 |
| 2001VU | SEMI AUTO CLS-AFT | 102MY | D06 |
Subtask 25-50-00-210-059-A ** ON A/C NOT FOR ALL
A. General Visual Inspection of the Decompression, Lining and Floor Panels
(1) Decompression panels:
(a) Examine each decompression panel for cracks and other damage.
(b) If a decompression panel is damaged, refer to (Ref. AMM TASK 25-50-00-200-024) (Ref. AMM TASK 25-50-00-340-002).
(c) Make sure that each decompression panel has a seal installed, missing seals are not permitted.
(d) Make sure that the seal of each decompression panel is in the correct condition.
(e) Make sure that each decompression panel is in the correct position.
(2) Floor panels:
(a) Examine each floor panel for:
(c) Make sure that the floor panels are correctly installed.
(d) Make sure that the sealant at the floor panel joints is in the correct condition.
(e) If the sealant is damaged, repair it (Ref. AMM TASK 51-76-11-300-001).
(3) Lining panels:
(a) Examine each lining panel for cracks and other damage.
(b) If a lining panel is damaged, refer to (Ref. AMM TASK 25-50-00-200-024).
(c) Make sure that each lining panel has a seal installed, missing seals are not permitted.
(d) Make sure that the seal of each lining panel are in the correct condition.
(e) Make sure that each lining panel is in the correct position.
(f) Make sure that the linings panels are correctly attached:
1 Tighten the loose fasteners to the correct torque value:
3 Missing fasteners are permitted for the ceiling, sidewall and partition lining panels if:
5. Close-up(1) Decompression panels:
(a) Examine each decompression panel for cracks and other damage.
(b) If a decompression panel is damaged, refer to (Ref. AMM TASK 25-50-00-200-024) (Ref. AMM TASK 25-50-00-340-002).
(c) Make sure that each decompression panel has a seal installed, missing seals are not permitted.
(d) Make sure that the seal of each decompression panel is in the correct condition.
(e) Make sure that each decompression panel is in the correct position.
(2) Floor panels:
(a) Examine each floor panel for:
- Impact damage
- Deep scratches
- Cracks
- Deformation
- Delamination.
NOTE: The strips of different colors are not considered as a damage of the floor panel. The bright points of the panel edge are not considered as a damage of the floor panel.
(b) If a floor panel is damaged, do a repair SRM 530200 or replace the panel (Ref. AMM TASK 53-22-14-000-001) (Ref. AMM TASK 53-42-14-000-001) or (Ref. AMM TASK 53-22-14-400-001) (Ref. AMM TASK 53-42-14-400-001). (c) Make sure that the floor panels are correctly installed.
(d) Make sure that the sealant at the floor panel joints is in the correct condition.
(e) If the sealant is damaged, repair it (Ref. AMM TASK 51-76-11-300-001).
(3) Lining panels:
(a) Examine each lining panel for cracks and other damage.
(b) If a lining panel is damaged, refer to (Ref. AMM TASK 25-50-00-200-024).
(c) Make sure that each lining panel has a seal installed, missing seals are not permitted.
(d) Make sure that the seal of each lining panel are in the correct condition.
(e) Make sure that each lining panel is in the correct position.
(f) Make sure that the linings panels are correctly attached:
1 Tighten the loose fasteners to the correct torque value:
- (Ref. AMM TASK 25-54-11-400-001)
- (Ref. AMM TASK 25-54-12-400-001)
- (Ref. AMM TASK 25-54-12-400-002)
- (Ref. AMM TASK 25-54-12-400-003)
- (Ref. AMM TASK 25-55-11-400-001)
- (Ref. AMM TASK 25-55-11-400-002)
- (Ref. AMM TASK 25-55-11-400-003)
- (Ref. AMM TASK 25-55-12-400-001)
- (Ref. AMM TASK 25-55-12-400-002)
- (Ref. AMM TASK 25-55-12-400-003).
3 Missing fasteners are permitted for the ceiling, sidewall and partition lining panels if:
- There are no fasteners missing at the corners of the lining panels
- Not more than one fastener is missing from an edge of the lining panel.
Subtask 25-50-00-860-052-A ** ON A/C NOT FOR ALL
A. Make sure that the work area is clean and clear of tools and other items.
Subtask 25-50-00-865-130-A ** ON A/C NOT FOR ALL B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 25-50-00-410-054-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | SEMI AUTO CLS-FWD | 3MY | E08 |
| 2000VU | SEMI AUTO CLS-FWD | 2MY | E06 |
| 2001VU | SEMI AUTO CLS-AFT | 103MY | D08 |
| 2001VU | SEMI AUTO CLS-AFT | 102MY | D06 |
C. Close Access
(1) Remove the WARNING NOTICE(S).
(2) Set the light switch to off.
(3) Close the forward and/or aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(4) Remove the access platform(s).
(5) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
(1) Remove the WARNING NOTICE(S).
(2) Set the light switch to off.
(3) Close the forward and/or aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(4) Remove the access platform(s).
(5) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
Decompression Panel