W DOC AIRBUS | AMM A320F

Discard ULB Battery


TASK 23-71-35-920-001-A
Discard ULB Battery


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 312
FIN: 1RK ** ON A/C NOT FOR ALL
1. Reason for the Job
Refer to the MPD TASK: 237135-01
DISCARD ULB BATTERY
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
312
AFT FUSLG TAIL SECTION
312AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 23-71-00-720-001-A
Operational Check of the Underwater Locator Beacon (ULB)
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
F Underwater Locator Beacon (ULB) ** ON A/C NOT FOR ALL
F Underwater Locator Beacon (ULB) ** ON A/C NOT FOR ALL
3. Job Set-up
NOTE: Make sure that a new Underwater Locator Beacon (ULB) is available for ULB replacement.
Subtask 23-71-35-861-051-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
Subtask 23-71-35-010-051-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position at zone 312.
   (2) Open access door 312AR.
4. Procedure
Subtask 23-71-35-020-051-B ** ON A/C NOT FOR ALL
A. Removal of the ULB from the Cockpit Voice Recorder (CVR)
F Underwater Locator Beacon (ULB) ** ON A/C NOT FOR ALL
   (1) For CVR Part Number (P/N) 980-6020-XXX (Serial Number (S/N) 3499 and less) or P/N 980-6022-XXX (S/N 2199 and less):
     (a) Remove the screws (1) from the clamps (2).
     (b) Remove the ULB (3) and the clamps (2) from the mounting cradle (4).
       1 If ULB type DK 100 is installed, send the ULB to the vendor to replace the battery.
   (2) For CVR P/N 980-6020-XXX (S/N 3500 and more), P/N 980-6022-XXX (S/N 2200 and more) or P/N 980-6032-XXX:
     (a) Remove the screws (1) from the clamps (2).
     (b) Remove the ULB (3) from the clamps (2).
       1 If ULB type DK 100 is installed, send the ULB to the vendor to replace the battery.
Subtask 23-71-35-020-051-CU ** ON A/C NOT FOR ALL
A. Removal of the ULB from the Cockpit Voice Recorder (CVR)
F Underwater Locator Beacon (ULB) ** ON A/C NOT FOR ALL
   (1) Remove the screws (3) from the clamps (2).
   (2) Remove the ULB (4) and the clamps (2) from the mounting cradle (1).
     (a) If ULB type DK 100 is installed, send the ULB to the vendor to replace the battery.
Subtask 23-71-35-960-050-A ** ON A/C NOT FOR ALL
B. Discard and replacement of the ULB battery
   (1) Send the related ULB battery to the workshop for discard and replace it with the new ULB battery.
Subtask 23-71-35-420-051-B ** ON A/C NOT FOR ALL
C. Installation of the ULB on the CVR
F Underwater Locator Beacon (ULB) ** ON A/C NOT FOR ALL
   (1) For CVR P/N 980-6020-XXX (S/N 3499 and less) or P/N 980-6022-XXX (S/N 2199 and less):
     (a) Make sure that the water sensitive switch of the ULB (3) is clean.
     (b) Install the ULB (3) in the clamps (2).
     (c) Put the ULB (3) and the clamps (2) in their installation position on the mounting cradle (4) and install the screws (1).
     (d) Turn the ULB (3) until you can read the battery replacement date.
     (e) Tighten the screws (1).
   (2) For CVR P/N 980-6020-XXX (S/N 3500 and more), P/N 980-6022-XXX (S/N 2200 and more) or P/N 980-6032-XXX:
     (a) Make sure that the water sensitive switch of the ULB (3) is clean.
     (b) Install the ULB (3) in the clamps (2).
     (c) Turn the ULB (3) until you can read the battery replacement date.
     (d) Install the screws (1).
     (e) Tighten the screws (1).
Subtask 23-71-35-420-051-CU ** ON A/C NOT FOR ALL
C. Installation of the ULB on the CVR
F Underwater Locator Beacon (ULB) ** ON A/C NOT FOR ALL
   (1) Make sure that the water sensitive switch of the ULB (4) is clean.
   (2) Install the ULB (4) in the clamps (2).
   (3) Put the ULB (4) and the clamps (2) in their installation position on the mounting cradle (1) and install the screws (3).
   (4) Turn the ULB (4) until you can read the battery replacement date.
   (5) Tighten the screws (3).
Subtask 23-71-35-720-050-A ** ON A/C NOT FOR ALL
D. Do the operational test of the Underwater Locator Beacon (ULB) (Ref. AMM TASK 23-71-00-720-001).
5. Close-up
Subtask 23-71-35-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close access door 312AR.
   (3) Remove the access platform(s).
Subtask 23-71-35-862-052-A ** ON A/C NOT FOR ALL
B. Aircraft Maintenance Configuration
   (1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.02 06:50:59 UTC